Construction of 3 Filtration Skids completed

In september after a successful FAT, Kropman Contamination Control started packing these Filtration skids for transport.

These skids are transported to Ireland where they will be connected and put into operation after a SAT (Site Acceptance Test) and Qualification. A complex and challenging project has been completed and the frames for the next series of skids are already being built in our prefab workshop.

Inge Philipsen